• Skip to content
  • Skip to primary sidebar
Nebraska Delts

Nebraska Delts

Beta Tau Chapter of Delta Tau Delta Fraternity

  • Home
  • About Us
  • Prospective Members
  • Support Delta Tau Delta
  • Recruitment
    • Student Recruitment Application
    • Recruitment Referral Form
  • Alumni
    • Support Delta Tau Delta
    • Update Contact Information
    • Thomas E. Wolf Alumnus of the Year Award
    • Beta Tau Blaster
    • Beta Tau House Corporation
    • Lost Delts
    • Chapter Eternal Reporting Form
  • Parents
  • Contact Us

2022 Summer Shelter Construction Project

Alumni, Chapter

Delta Tau Delta Shelter at the University of Nebraska-Lincoln
Delta Tau Delta Fraternity Shelter at the University of Nebraska-Lincoln
March 14, 2022

House Corporation Plans 2022 Summer Shelter Construction Project

For those Delts from the 1980s, I’m glad to report that Ilene Fry’s ghost still haunts our kitchen!  But unfortunately, I must also report that the kitchen appliances and cold storage units that Ilene used also still haunt our kitchen.  Some of our equipment dates back to the 1969 addition or to updates done in the early 80s. The kitchen was not part of the Shelter remodel done ten plus years ago, but House Corp is taking on the challenge of updating components of the Shelter’s kitchen.  We need to provide a safe and functioning cooking environment for the current members. 

2022 Summer Shelter Construction Project Kitchen
2022 Summer Shelter Construction Project

            House Corp’s plan is to do updates in phases over the summer, to limit disruption to Chapter operation.  This summer we plan to replace the convection oven, replace the east wall wooden cabinets with stainless steel shelving, and professionally clean and spot repair the tile floor.  Summer 2023 we plan to tackle the cold and dry storage areas.  Possibly a walk-in cooler / freezer combination and move the pantry dry storage to the walk thru area.  Increases storage capacity and removes the heat that the cooler units put out. 

            We are also considering remodeling the dining room, adding more of a “stately” feel to the room.  Also add noise reduction materials to create more areas in the Shelter that provide an atmosphere beneficial to academic study in the Shelter.  The concrete block walls aren’t the most appropriate or appealing. 

2022 Summer Shelter Construction Project
2022 Summer Shelter Construction Project
Chuck Allen Delta Tau Delta
Chuck Allen (Beta Tau, 1987)-House Corporation Vice President

            Current updates are being funded by a generous Beta Tau Delt, other contributions are welcome.  We likely will have to execute a short capital campaign to obtain all the needed funding for next summer’s projects.  House Corp’s approach is to prudently update what is absolutely necessary, maintain what is still functioning, and remodel only where it counts with recruitment and member dining experience in mind.

If you would like to support the 2022 Summer Shelter Construction Project, we would appreciate it! Your gift can be mailed to the following address:

The House Corporation of Delta Tau Delta

PO BOX 5951

Lincoln, NE 68505  

  • « Go to Previous Page
  • Page 1
  • Interim pages omitted …
  • Page 21
  • Page 22
  • Page 23
  • Page 24
  • Page 25
  • Interim pages omitted …
  • Page 39
  • Go to Next Page »

Primary Sidebar

Recent News

  • M*A*S*H 2025 April 28, 2025
  • 2024 Alumni Weekend July 18, 2024
  • Nebraska Delt Paul Engler Remembered May 6, 2024
  • 130 Years of Beta Tau Celebration! March 7, 2024
  • Mike Borgialli Enters the Chapter Eternal March 5, 2024
  • 2024 Annual Meeting of Members Held January 29, 2024
  • Membership Anniversary (2023) December 10, 2023
  • Support Delta Tau Delta October 1, 2023

Article Categories

  • Alumni (23)
  • Chapter (13)
  • Holiday (3)
  • Recognition (7)
  • Uncategorized (1)

Copyright © 2025 · Essence Pro on Genesis Framework · WordPress · Log in